Drawings and Renderings Submitted by Congregation To BSA and LPC - 2002-2008
May 13, 2008 Drawings Filed by CSI with BSA
Proposed New Building With Courtyard Plans of various dates - 17 pages of plans.
As-of-Right-Zoning Envelope Section - Parsonage dated May 12, 2008.
Environmental Assessment date May 12, 2008 from ARKF (includes shadow studies).
March 12, 2008 Submitted by Applicant to BSA
December 28, 2007 Submitted by Applicant to BSA
Programmatic Need Drawings - Existing and Proposed
- PR0G E-6 Existing Cellar Floor
- PROG E-7 Existing First Floor
- PROG E-8 Exisiting Second Floor
- PROG E-9 Existing Third Floor
- PROG E-10 Ex-10 Existing Fourth Floor
- PROP P-6 Sub Cellar Proposed
- PROP P-7 Cellar Proposed
- PROP P-8 First Floor Proposed
- PROP P-9 Second Floor Proposed
- PROP P-10 Third Floor Proposed
- PROP P-11 Fourth Floor Proposed
October 27, 2007 Drawings Submitted to BSA
November 8, 2006 Drawings Presented to BSA Improper Ex Parte Meeting (same as March 14, 2006 drawings).
March 14, 2006 Drawings and Renderings
Filed with LPC [note - Not complete set of drawings. To understand the project, must also review the August 15, 2005 drawings].
|